Winter project

Winter (or what passes for winter here) project: replacing all the remaining wooden frames with metal. That’s about 90 frames or so to redo. And fill with good soil mixed with cow poop. Yesterday we ordered a bunch of material for delivery from Home Depot, and picked up the miscellaneous other items we needed so we can plow through (so to speak) to have it all done by March when it will be time to start peas and beans. Bro #2 will be assisting by cutting the metal to size for me and also getting the supports cut down for bracing. Then yours truly will begin the laborious process of replacing the existing frames and topping them with the good, poopy dirt from an old dairy farm, which we will have delivered this week, most likely, so it can age out a bit. If anyone wants a bunch of 1″ x 6″ x 8′ boards, you’re welcome to them for free – but you have to come pick them up. There will also be some 1″ x 6″ x 4′ boards as well, although some of those are in only fair condition because they’ve been out the longest.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.